Increase of unloading capacity on track K2 APSP bl.40
Slovnaft, a.s.
Technical-economic study.
Year of implementation: 2020
Investment costs: 7 500 €
-
Wash Water at AVD 6 unit
Slovnaft, a.s.
Project + complete execution.
Year of implementation: 2019
Investment costs: 1 100 000 €
-
RHC Ebullating pump seal oil
Slovnaft, a.s.
Project + complete execution.
Year of implementation: 2018
Investment costs: 1 022 000 €
-
Diesel Component Blending - Engineering
Slovnaft, a.s.
Complete project documentation and engineering.
Year of implementation: 2018
Investment costs: 303 000 €
-
Study for location of the new vacuum-creating systems for AVD6 and RHC units
Slovnaft, a.s.
Technical-economic study.
Year of implementation: 2018
Investment costs: 39 000 €
-
Modification of lye washing DA205
Slovnaft, a.s.
Project for execution.
Year of implementation: 2018
Investment costs: 19 000 €
-
Exchange of P57A/B pumps
Slovnaft, a.s.
Project for execution.
Year of implementation: 2018
Investment costs: 13 500 €
-
Exchange of the GA 118 B pump
Slovnaft, a.s.
Project for execution.
Year of implementation: 2018
Investment costs: 16 500 €
-
NKO tank
Slovnaft, a.s.
Deliveries, execution of measurement and control part – equipment of the tank.
Year of implementation: 2018
Investment costs: 205 000 €
-
Modifying of the compressor cooling system
Slovnaft, a.s.
Project for execution.
Year of implementation: 2018
Investment costs: 16 000 €
-
New condensate pump P-103.103 A
Slovnaft, a.s.
Project for execution.
Year of implementation: 2018
Investment costs: 49 000 €
-
Measures for pumping of dark products
Slovnaft, a.s.
Project + complete execution.
Year of implementation: 2017
Investment costs: 710 000 €
-
Increasing of the protection of the Little Danube
Slovnaft, a.s.
Project + complete execution.
Year of implementation: 2017
Investment costs: 158 000 €
-
Wash water C2 column at BADU5 unit
Slovnaft, a.s.
Complete execution.
Year of implementation: 2017
Investment costs: 570 000 €
-
Aromatics Extraction - connections
Slovnaft, a.s.
Project for building licence, project for execution, engineering.
Year of implementation: 2017
Investment costs: 60 000 €
-
Light production increase (KHK)
Slovnaft, a.s.
Project for execution + engineering.
Year of implementation: 2016
Investment costs: 92 000 €
-
Modification at the filling station BTX
Slovnaft, a.s.
Single stage project documentation.
Year of implementation: 2016
Investment costs: 40 000 €
-
Auto-start of GT 104 turbine at the Ethylene unit II
Slovnaft, a.s.
Project for execution.
Year of implementation: 2015
Investment costs: 21 000 €
-
Installation of the pump and turbine GA/GT at Eth.unit II
Slovnaft, a.s.
Project for execution.
Year of implementation: 2015
Investment costs: 22 000 €
-
Installation of bagging machine
Slovnaft, a.s.
Project for execution + complete execution
Year of implementation: 2015
Investment costs: 745 000 €
-
Reconstruction of water reservoir
Slovnaft, a.s.
Project for execution + complete execution.
Year of implementation: 2015
Investment costs: 716 000 €
-
Exchange of pump P-705B
Slovnaft, a.s.
Project for execution + complete execution.
Year of implementation: 2015
Investment costs: 55 000 €
-
Energy savings by pump replacement at P1
Slovnaft, a.s.
Project for execution and complete execution.
Year of implementation: 2014
Investment costs: 77 000 €
-
C3 recovery from membrane separator unit at PP3
Slovnaft, a.s.
Project for execution and complete execution.
Year of implementation: 2014
Investment costs: 230 000 €
-
Installation of remotely controlled valves at Ethylene Unit
Slovnaft, a.s.
Project for execution and complete execution.
Year of implementation: 2014
Investment costs: 550 000 €
-
Steam Cracker Reconstruction (Ethylene Unit)
Slovnaft, a.s.
Project for execution + delivery of pumps.
Year of implementation: 2014
Investment costs: 280 000 €
-
AVD6 Revamp
Slovnaft, a.s.
Project for execution + delivery of pumps and vacuum system.
Year of implementation: 2014
Investment costs: 880 000 €
-
Storage and injection of H2SO4 at CC4 unit
Slovnaft, a.s.
Project for execution + pump delivery .
Year of implementation: 2013
Investment costs: 70 000 €
-
Connection of HOPV cooling water at DBP2
Slovnaft, a.s.
Project for execution + execution .
Year of implementation: 2013
Investment costs: 500 000 €
-
Dosing of sulfurisation agent at Ethylene unit
Slovnaft, a.s.
Project documentation + execution.
Year of implementation: 2012
Investment costs: 200 000 €
-
Leak detection of double wall standing tank
Slovnaft, a.s.
Delivery and installation of 30 pcs. of underpressure leak detector for tanks (mazut, light petrol, oil)
Year of implementation: 2012
Investment cots: 241 000 €
-
Gas Phase suction from Railway Tanks at P-2.4
Slovnaft, a.s.
Project documentation + compressor delivery.
Year of implementation: 2012
Investment costs: 145 000 €
-
VK BR BGDS 1,2 Reconstruction of Draining System
Slovnaft, a.s.
Project for execution + pump delivery.
Year of implementation: 2012
Investment costs: 42 000 €
-
Installation of STOP valves at loading stations in terminal Bratislava, Klačany, Kapušany
Slovnaft, a.s.
Project for execution + execution of the machine part.
Year of implementation: 2012
Investment costs: 66 000 €
-
Virgin Naphtha – loading of railway tanks
Slovnaft, a.s.
Delivery of main pumps Teikoku.
Year of implementation: 2012
Investment costs: 110 000 €
-
Product pipeline between Slovnaft – Port Bratislava
Slovnaft, a.s.
Delivery of main pumps Teikoku and auxiliary pumps Blackmer
Year of implementation: 2012
Investment costs: 155 000 €
-
Exchange of exchanger EA-217 at Ethylene unit
Slovnaft, a.s.
Project + execution.
Year of implementation: 2012
Investment costs: 223 000 €
-
Replacement of P-123.501A pump
Slovnaft, a.s.
Delivery and installation of pump including As Build documentation.
Year of implementation: 2011
Investment costs: 119 000 €
-
Leak detection system for the double bottom storage tanks
Slovnaft, a.s.
Delivery and installation of 5 pcs of Underpressure leak Detectors for storage tanks at 47, 48 and 53 block
Year of implementation: 2010
Investment costs: 100 000 €
-
Leak detection system for the double bottom storage tanks
Slovnaft, a.s.
Delivery and installation of 5 pcs of Underpressure leak Detectors for storage tanks at 45, 48 a 53 block.
Year of implementation: 2009
Investment costs: 80 000 €
-
Safety showers installation at Ethylene unit
Slovnaft, a.s.
Delivery and installation of 2 pcs HAWS safety showers.
Year of implementation: 2009
Investment costs: 29 900 €
-
Cumene production unit – replacement of P3.1 pump
Slovnaft, a.s.
Design, delivery and installation of HERMETIC pump.
Year of implementation: 2009
Investment costs: 66 400 €
-
Exchange of pumps at the unit AD5
Slovnaft, a.s.
Project, delivery and installation of 2 pcs. TEIKOKU pumps.
Year of implementation: 2008
Investment costs: 107 000 €
-
Exchange of valves and fittings on the boiler K3
Slovnaft, a.s.
Delivery and installation of valves EMERSON with accessories.
Year of implementation: 2008
Investment costs: 119 000 €
-
Installation of the canned motor pump TEIKOKU
Slovnaft, a.s.
Project and complete realization.
Year of implementation: 2007
Investment costs: 88 400 €
-
Leak detection system of double bottom plate of vertical overground tank
Slovnaft, a.s.
Delivery and installation of 9 pcs. vacuum leak detection devices for the heavy residues and light petrol tanks.
Year of implementation: 2007
Investment costs: 73 200 €
-
Dosing system of methanol
Slovnaft, a.s.
Delivery of dosing pump LEWA with accessories, technical consulting
Year of implementation: 2006
Investment costs: 135 000 €
-
Pumping of the sludge
Slovnaft, a.s.
Delivery of 3 pcs pneumatic pump Wilden with accessories, technical consulting by the projection
Year of implementation: 2006
Investment costs: 16 000 €
-
Conversion MTBE to ETBE
Slovnaft, a.s.
Delivery of 2 pcs Sundyne LMV 322 and Sunflo for ethanol and water.
Year of implementation: 2006
Investment costs: 142 000 €
-
Folding stairway
Slovnaft, a.s. SKP
Delivery of 2 pcs folding stairway EMCO Wheaton with accessories
Year of implementation: 2006
Investment costs: 19 900 €
-
Tubular post - 2. phase
Slovnaft, a.s. PP
Realization project of the tubular post in length of ca 0,8km inclusive the stations
Year of implementation: 2005
Investment costs: 3 000 €
-
Installation of cooler W-111
Slovnaft, a.s. RHC
Realization project – machine-technological part.
Year of implementation: 2005
Investment costs: 3 000 €
-
Dosing system for NaOH
Slovnaft, a.s. EJ
Delivery of 1 pcs dosing pump LEWA with accessories + technical consulting by the installation
Year of implementation: 2005
Investment costs: 142 000 €
-
Mobile sludge pump
Slovnaft, a.s. SKP
Delivery of mobile selfprimimg pump with hoses for sludging of emergency tanks with high content of carbohydrates + project consulting
Year of implementation: 2005
Investment costs: 10 000 €
-
Delivery of the pumps Sundyne LMV 311 for liquid hydrocarbons
Slovnaft, a.s. FCC
Delivery of 2 pcs high pressure pumps, project consulting
Year of implementation: 2005
Investment costs: 145 000 €
-
Dosing system of condensate and MDEA
Slovnaft, a.s.
Delivery of 2 pcs dosing pump LEWA with accessories, project consulting
Year of implementation: 2005
Investment costs: 155 000 €
-
Pumping of damaged tank wagons
Slovnaft, a.s.
Delivery of self priming pump with magnetic coupling HMD Kontro with hoses, consulting
Year of implementation: 2005
Investment costs: 6 600 €
-
Tubular post -1. phase
Slovnaft, a.s. PP
Realization project of the tubular post in length of 1,5 km inclusive the stations
Year of implementation: 2005
Investment costs: 10 000 €
-
Delivery of the vertical pump Flowserve for the sludge
Slovnaft, a.s. HRP 6, HRP2
Delivery of 3 pcs pump, consulting by projection.
Year of implementation: 2004
Investment costs: 103 000 €
-
Delivery of the pumps Sundyne LMV 322 for MDEA
Slovnaft, a.s. HRP 6
Delivery of 2 pcs high pressure pump, consulting.
Year of implementation: 2004
Investment costs: 103 000 €
-
Delivery of the vertical pump Johnson Pump typ CombiSump for high temperature sludge
Slovnaft, a.s. KHK
Delivery of the pump with accessories
Year of implementation: 2004
Investment costs: 58 000 €
-
Unloading of container and dosing system for triethanolamine
Slovnaft, a.s. Izomerizácia
Delivery of dosing pump LEWA, unloading pneumatic pump Wilden
Year of implementation: 2004
Investment costs: 52 000 €
-
Sludge channel drainage system
Slovnaft, a.s.
Delivery of the mobile self-priming pumps + engineering
Year of implementation: 2004
Investment costs: 52 000 €
-
Utilization of HOPV water for DBP-1,2 plant
Slovnaft, a.s. sklady olejov
Project documentation for administration approvals and realization
Year of implementation: 2004
Investment costs: 4 600 €
-
Delivery of Sundyne LMV 341 pump
Slovnaft, a.s. KHK
Delivery of the high pressure water pump +
Year of implementation: 2004
Investment costs: 206 000 €
-
Fire-water manifold on PP3 plant
Slovnaft, a.s. PP3
Detail engineering for the technology supplier Caccialanza.
Year of implementation: 2004
Investment costs: 13 300 €
-
Storage and unloading system of N-alkanes
Slovnaft, a.s. VURUP
Delivery of piston pumps, double wall surface vessels leak detection system and unloading hoses.
Year of implementation: 2002
Investment costs: 67 000 €